Description

This is a pure industrial structure which involved design, fabrication and installation of 40m wide x 96m long x 20m high structure with two lines of 30 and 10 tonne E.O.T cranes.

Challenge Faced

The main challenge was erection timeframe. Site was ready for erection in mid-December of 2024 while the project handover date was slated for 15th February 2025. Erection of 450 tonnes of steelwork, roofing and side cladding sheets, installation of crane rails was to be done within the 8 weeks that had been allocated.

Solutions Implemented

Through meticulous planning, we briefed and assigned multiple teams each with daily targets on their scope of work.  Each team was adequately equipped to ensure safe, seamless and timely execution of their work.  Eventually, we met our target and structure was ready for installation of E.O.T cranes on the agreed date.

Client Feedback

The client was satisfied with quality and timely execution of their project

Furnace & Scrap Metal Shed

Client: Tononoka Rolling Mills
Date: March 2013
Category: Factories