Products
Explore our full range of precision-engineered steel products, including water tanks, fuel tanks, bridges, warehouses and godowns, factories, ventilation systems, and roofing solutions.
Our Clients & Partners














What Our Clients Say

We have had the opportunity to work with M/s. David Engineering Limited over the past years through a variety of new construction projects in which we have been the Main Contractor.
In the recent past M/s. David Engineering Limited undertook the works of "Canopy and Spire" at Britam Tower at Upper Hill, Nairobi which they completed to our satisfaction.
We can truly say that M/s. David Engineering Limited is a Company with great integrity, is extremely dedicated to their Customers and we highly recommend them for any future construction projects.
Director
Laxmanbhai Construction

We are very pleased to recommend the good quality, excellent services and timely completion by David Engineering Kenya Ltd who have completed to our satisfaction the fabrication, supply and erection of steelwork and roofing for our Cianda Mall Project on Ronal Ngala Street.
The project consisted of a 4-Storey Building and roof made entirely as a steel structured building.
We highly recommend them for all your structural steel construction needs.
Director
Sibed Transport Co.

We contracted David Engineering Limited for the design, supply and installation of the steel work elements of seventeen buildings, to the latest British Standards.
This work was part of the design and build contract for Laikipia Airbase Development Phase 2B contracting to the UK Ministry of Defence. David Engineering provided the steel frames and where applicable staircases and cladding systems for the following buildings:
- 10 x accommodation buildings, with floor areas up to 915m² (8 double storey and 2 single storey)
- 1 x Combined Medical and Dental Centre, to British Clinical standards with a floor area of 1,200m².
- 1 x two storey Office Building, floor area of 1,028m².
- 1 x simple storage facility, floor area +300m².
- 3 x large storage facilities with floor areas in the region of 3,000 to 4,500m² each
- 1 x Physical and Recreational Training Centre, floor area in excess of 1,200m²
These works were completed in June 2019.
G3 Systems
Project Director

This is in reference to our project of extension of mezzanine floor structure inside our new factory premises. This project was completed by David Engineering within the agreed time frame to our satisfaction.
We would certainly consider them for any of our future projects.
We are more than happy to recommend the company for similar work if being undertaken by any other customers.
Director
Flame Tree Africa Ltd.